Energy and offshore wind

Energy and offshore wind

Energy sites are large, exposed and rarely quiet. Signage has to be legible at distance, survive a coastal environment and go up without interrupting the operation underneath it.

  • Scale first

    Building identification on a manufacturing hall is read from a road or a river, so it is specified for viewing distance rather than wall space.

  • Coastal exposure

    Substrate, coating and fixing are chosen for salt, wind and UV, because the replacement cycle on an exposed elevation is what actually costs money.

  • Live industrial sites

    Installation is planned around plant movements, permits and site inductions, with site-specific RAMS issued before mobilisation.

  • Manufacturing halls
  • Quayside identification
  • Compound and yard signage
  • Statutory and safety

Sign Design has delivered building identification at Teesworks, including work for SeAH Wind on the Redcar site.

Disciplines

Designed with purpose, delivered with impact.

Trusted on the jobs that cannot go wrong.

Applebridge FamilyWillis Aviation ServicesMiddlesbrough CouncilCMA CGMTeesside HospiceHartlepool Borough CouncilHartlepool United FCTeesworksWorcester City CouncilTetleyC W RussellStockton-on-Tees Borough CouncilSeAH WindWynyard ParkEndolysTeesside International AirportBell Truck and VanTFK GroupDAFVolvoJDRSteel River QuayIvecoSteel River PowerHewitson Limited